One moment, please http://silverdaddies.fun/ silverdaddies.com For 2014, Henin said he expected to reach production of 35,000 boe/d in Gabon. This would lead to bottlenecks in the Total pipeline to Cape Lopez which could be resolved using a neighbouring Shell pipeline, the CEO said.
|